Location Information |
|
Hemisphere: |
South America |
|
Province/Area: |
Brazil |
|
Block: |
'RJS-366' |
|
Water Depth: |
1067
MSW |
|
|
|
|
General Information |
|
High Press./High Temp.: |
No |
|
Water Injection: |
Yes |
|
Stranded Gas: |
No |
|
Service: |
Oil |
|
|
|
|
Owner Information |
| Operator |
% |
| Primary - Chevron | 51.74 | | Japao Petrolei Limitada | 18.26 | | Petrobras | 30 |
|
| |
|
Probability & Startup Information |
|
First Drill Date: |
4/1/1998 |
|
Discovery Date: |
7/1/1998 |
|
Appraisal Start: |
|
|
Sanction Date: |
7/1/2006 |
|
Startup Qtr/Year: |
2 \ 2009 |
|
Startup Date: |
6/23/2009 |
|
Dev Cost: |
$3,000,000,000 |
|
|
|
|
Reserve Information |
|
Oil Reserves: |
270MMBBLS |
|
Gas Reserves: |
BCF |
|
BOE Reserves: |
MMBBLS |
|
|
Field Schematic |
|
 |
|
|
|
|
|
|
Project Notes |
Disc in 1998 by Petrobras; expected daily prod for 2009 is 30,000 boepd; heavy oil; 120km from Rio; precommissioning and startup process took approx 6 weeks after last riser was installed/hooked up |
|
|
|
|
|
|
|
|
|
|
|
Project Details |
|
|
Status: |
Flowing |
|
Subsea Bid Date: |
8/1/2005 |
|
Tree Award Date: |
6/3/2006 |
|
|
|
Total Trees: |
21 |
|
Classification: |
Horizontal |
|
Tree Location: |
Cluster |
|
No. Manifolds: |
|
|
|
Subsea Processing on Field: |
No |
|
|
|
|
Host Information |
|
|
Offset to Host: |
5000
(Mtr) |
|
Host Type: |
FPSO |
|
Host Field Name: |
FRADE (FPSO FRADE) |
|
Host Location: |
RJS-366 |
|
Host Water Depth: |
1067
(Mtr) |
|
|
|
|
Engineering Information |
|
|
Engineering Contractor 1: |
Intec Engineering |
|
|
|
|
|
|
|
|
|
|
Contractor Information |
|
|
Contractor: |
Acergy |
|
Contract Type: |
URF + Exports |
|
Contract Award: |
1/1/2006 |
|
|
|
|
Awarded Subsea Tree Information |
|
| Subsea Tree Ct |
Status |
1st Startup |
Max Water Depth (mtr) |
Tree Mfg |
Control Type |
Control Mfg |
| 19 | Flowing | 2009 | 1150 | FMC Technologies | MUX E/H | FMC Technologies | | 2 | Pending/Construction | 2012 | 1067 | FMC Technologies | MUX E/H | FMC Technologies |
|
|
|
|
|
Subsea Flowline Information |
|
| No. Flowlines |
Total Length (Mtr) |
OD Outer Pipe |
Design |
Flowline Type |
Status |
Contractor |
Installation Start |
| 2 | 96000 | 6 - 8 | Export Pipeline, Infield Flowline | Flexible | Flowing | Acergy | 01/11/2008 |
|
|
|
|
|
Subsea Production Umbilical Information |
|
| Length (Mtr) |
Mfg Status |
Mfg |
Contractor |
Installation Start |
| 1100 - 19308 | Flowing | Oceaneering Umbilical Solutions | Acergy | 03/29/2008 |
|
|
|
|
|
Subsea Project Notes |
Dev Scenario: FPSO w/predrilling subsea gas lift,open hole gravel-pack producers,vertical water inj wells. GAS EXP VIA P-52 EXPORTS;Intec/Alliance FEED. TENDERING 2H 2005 WITH POSS AWARD 1H 2006;contract unlikely to be awarded before Feb 2006 - joint ventures between Technip/Subsea7 and Stolt(Acergy)/Wellstream only two to submit bids;award due shortly with FMC in front for subsea hardware and Acergy and Technip up for URF with Acergy in the lead;TRANSOCEAN HAS LOI FOR DRILLING DEVP TREES IN LATE 2007;FMC SIGNED CONTRACT FOR 19 WET TREES, 22 WELLHEADS, 28 PLEMS, CONTROL SYSTEMS AND OTHER EQUIPMENT;ACERGY SIGNED CONTRACT FOR $245MM TO INSTALL FLEXIBLE LINES, UMBILICALS AND ANCHOR PILES BEGINNING 10/2007 - FLEXIBLE EXPORT WILL BEGIN 01/2008;CRUDE OIL WILL BE EXPORTE VIA TANKER;12 PRODUCERS AND 7 WATER INJECTORS;DEVP WILL COME ON LINE WITH 2 WELLS (1 PROD AND 1 INJ) IN LATE 2008 WITH SUBSEQUENT DRILLING OF REMAINING WELLS; 14 drill centers: 8 production and 6 water injection; CHEVRON PICKED UP 2ND RIG (NOBLE LEO SEGERIUS)TO DRILL ON FRADE 2/18/2011 |
|
|
|
|
|
|
|
|
|
|
|
Project Details |
|
|
|
|
|
FPS Bid Date: |
6/1/2005 |
|
|
|
|
FPS Details |
|
|
FPS Type: |
FPSO |
|
FPS Name: |
FPSO FRADE |
|
FPS Owner: |
Chevron |
|
FPS Cost: |
500,000
$(000) |
|
Design Capacity Oil: |
100,000
BOPD |
|
Design Capacity Gas: |
106
MMCFPD |
|
Design Storage Capacity: |
1,500,000
BBLS |
|
Engineering Contractor: |
|
|
Surface Well Count: |
0 |
|
|
|
|
Hull Information |
|
|
Hull Status: |
Flowing |
|
Hull Designer: |
SBM |
|
Hull Fabricator: |
Drydock World Dubai |
|
Hull Contract Value: |
($000) |
|
Hull Install Date: |
3/30/2009 |
|
Hull Installer: |
|
|
|
|
|
Topsides Information |
|
|
Topsides Status: |
Flowing |
|
Topsides Designer: |
SBM |
|
Topsides Fabricator: |
LAMPRELL |
|
Topsides Contract Value: |
($000) |
|
Topsides Install Date: |
2/15/2008 |
|
|
|
|
Riser Information |
|
| Riser Type |
# Risers |
| Export |
1 |
| Gas lift/test |
3 |
| Injection |
2 |
| Production |
12 |
| Umbilical |
4 |
|
| |
| Riser Length: |
1151 Mtr |
| Diameter: |
6 - 8 Inches |
| Riser Material: |
Flexible |
| Riser Config: |
Catenary |
| Install Start: |
03/29/2008 |
|
|
|
|
|
FPS Project Notes |
VESSEL OPERATED BY SBM; converted tanker; liquids handling capacity = 150,000 barrels/day; water injection capacity = 150,000 barrels/day;
HULL TONS = DWT |
|
|
|
|
|
|
|
|
|
|
|
|
|