 |
3/8/2010 - ANTRIM SHOPS FYNE DEVELOPMENT SOLUTIONS |
| Antrim Energy is currently in discussion with FPSO providers, as well as local existing infrastructure owners, to select the most efficient production export route for the Fyne field. An FPSO pre-qualification process has been conducted and engineering studies are being undertaken for an alternative subsea tieback scheme to nearby third party infrastructure. The production system is being engineered to handle up to 20,000 BOPD directly from the Fyne field, with potential capacity add-ons to handle additional volume from the satellite fields.
Antrim intends to select the optimum development scheme and progress FDP submission this year. |
| |
|