 |
1/23/2012 - SUBSEA 7 GRABS $60MM CONTRACT WITH SANTOS |
| Subsea 7 inked a $60 million SURF contract from Santos Limited on the Fletcher-Finucane Development offshore Western Australia. The contract scope includes the project management, engineering and installation of approximately 55km of flexible flowlines; over 60km of umbilicals; and associated structures to connect the wells to the existing Exeter Mutineer facilities. The scope also includes pre-commissioning activities and other associated services.
Project management and engineering will commence immediately with offshore operations scheduled to commence late 2012 using ROCKWATER 2. |
| |
|